Yacht Description
Hatteras 60 Motor Yacht yacht is a 60 ft long motor yacht monohull for sale and is available to be inspected for sale in summer and winter United States. It was built by Hatterasin 2011. . The yacht layout features 3 cabins. The cabin arrangement is following: .
The motor yacht features Caterpillar C-18 ACERT diesel 1135 hp Caterpillar C-18 ACERT diesel 1135 hp engines.
Hatteras 60 Motor Yacht Yacht Details
Cabins
Built by
Price
Price Details
Price : €1,435,000
Amenities
Specifications
- Caterpillar C-18 ACERT diesel 1135 hp Caterpillar C-18 ACERT diesel 1135 hp
Features
More Specifications
Other Entertainment
In true Hatteras fashion, this passage-maker is not only practical but also customizable, with several different design options inside and out. The standard lower deck arrangement features a three-stateroom, two-head layout that places a full-beam master suite amidships, a VIP berth forward, and guest bunks to port.
Premium carpeting throughout full canvas runner set
Sharp Aquious 40" flat screen TV
Bose Life style surround sound system
High gloss teak coffee table with compass rose inlay
(2) Blue barrel swivel chairs
Large leather sofa with storage beneath
Ocean Air mini blinds
Large stainless steel trimmed salon entry sliding glass door
Abundant storage throughout
A single step up from the salon leads to the U shape galley with a country kitchen a large circular dinette which is found to port
Large L shape granite counter tops throughout
Dark laminate flooring throughout
Island style galley with stainless steel recessed sink Grohe satin finished spigot, storage and pull out trash can
Miele 4 burner glass cooktop
Miele stainless steel oven
Miele Optima series dishwasher with matching cabinet face
Jenn-Air stainless steel microwave convection oven
Jenn-Air drawer style undercounter refrigeration (2) refrigerators (2) freezers
U-Line clear ice maker
U-Line stainless steel wine chiller
Large L shape circular dinette with large granite counter top
Located downstairs from the galley features abundant cabinet storage and a small pantry
Whirlpool stackable washer dryer combo is located in the hallway
Located to the Port side is the guest stateroom featuring over/under berths for two
Cedar lined hanging closet
Carpeted sole throughout
Storage and book shelves
Sharp 15" flat screen TV
Clarion CMV-1 DVD/CD player
Located all the way forward is the VIP stateroom
Large center lined Queen size berth with abundant storage beneath
Large overhead deck hatch with sun shade
Large cedar lined hanging closet
Sharp 15 ' flat screen TV
Clarion CMV-1 DVD/CD player
Polk Audio overhead speakers
A/C controls
Abundant storage throughout
Guest head ensuite access
Located downstairs to Starboard lies the guest head with hall way and VIP ensuite access
Large mirrored medicine cabinet
Corian countertop with white Kohler undermounted sink
High gloss fixtures throughout
Large walk in shower stall featuring curved acrylic door
Fresh water marine head
Exhaust fan
Dark laminate flooring
Located all the way Aft is the expansive full beam master stateroom with center lined King size berth and dual hull side windows provide excellent lighting
Full King size master berth with storage beneath
Dual cedar lined his and hers hanging closets
Sharp Aquios 40" flat screen TV
Bose surround sound system
Large 6 drawer dresser to Starboard
Make up desk/vanity with padded stool
Ocean Air blinds
Large 6 drawer dresser to Port
A/C controls
The Master stateroom head features a large counter space as well as a full walk in shower stall with abundant storage throughout
Polished marble counter tops
Round White Kohler surface mounted sink
Custom tiled backsplash
Large walk in shower with teak sub floor and glass sliding doors
Large mirrored medicine cabinet
Mirrored ceiling
Exhaust fan
Fresh water marine head
Dark laminate flooring throughout
The fully climate controlled Flybridge offers amazing views and an additional level of entertaining with an open Aft deck featuring an Electric grill and refrigerator
Center lined helm with modified A/C ducts for better air flow
Dual Pompanette Platinum Series helm chairs with cloth covers
L shape seating Aft with storage below
Large white fiberglass table
Indoor/outdoor carpeting inside helm deck
Full enclosure throughout flybridge
Gaggenau stainless steel grill with custom cabinet
U-Line refrigerator
Steel Head WD1000 davit
(2) Raymarine Axiom 12RV MFD displays
Simrad AP-24 autopilot
Furuno RD-30 depth repeater
Flir camera
ACR spotlight
Icom IC-M604 VHF
Fusion marine stereo Fusion Coax speakers
CAT digital engine dispalys
ZF controls with optional joystick
ZF emergency back up controls
American Bow Thrusters hydraulic bow thruster
Yacht Controller
Hatteras information center
Located beneath the Aft deck is the large access hatch to the engine room which can also be entered through the transom bustle door
(2) Caterpillar C-18 ACERTS 1075 hours
(2) Onan 21.5 KW marine gen sets PT 931 hours STB 872 hours
Chargemaster 24/60-3 marine battery charger
Pronautic 24-20P marine battery charger
American Bow Thruster hydraulic bow thruster
Aquamiser Plus AM 826S water maker
Sea -Fire FM-200 fire Suppression System
Headhunter Mach 5 fresh water pump
Delta -T engine ventilation system
Dual Glenn-denning shore cord retractors
Large Lazzerette storage all the way aft with transom bustle door
All the owners personal affects, tools, and spare gear not pertaining to the boat the tender is not available at this point in time
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.
Gallery

























































































































