Yacht Description
Hatteras GT59 yacht is a 59 ft long motor yacht monohull for sale and is available to be inspected for sale in summer and winter United States. It was built by Hatterasin 2021. . The yacht layout features 3 cabins. The cabin arrangement is following: .
The motor yacht features CAT C-32A diesel 1622 hp CAT C-32A diesel 1622 hp engines.
Hatteras GT59 Yacht Details
3
Cabins
Hatteras
Built by
€3,599,000
Price
30
Cruising Speed
Price Details
Price : €3,599,000
Amenities
Specifications
- CAT C-32A diesel 1622 hp CAT C-32A diesel 1622 hp
Features
Cruising Speed: 30
More Specifications
Other Entertainment
- Interior cabinetry in satin finished teak
- Leather sofa with storage and pull out berth
- Teak coffee table in high gloss teak with flip up desk style top, storage
- Leather dinette with storage under and high gloss teak table
- Carpet flooring with Amtico floor at entry door
- Samsung 40" TV with electric lift in teak counter fwd of dinette
- Denon Salon AV/receiver - Model AVRX3600HBKE3
- KVH Sat TV
- Definitive Technology subwoofer - model SUPERCUBE 2000
- Samsung Blue ray player
- Two Jenn-Air drawer fridges(2 drawers each) - model JUDFP242HXO1
- Miele 4 burner electric cooktop - model KM56212
- Sharp microwave - model R-1881LSY
- U-Line icemaker opposite galley - model ULN-B195CB-03A
- Emerson garbage disposal in stainless steel sink
- Corian blue countertops
- Storage cabinets & full height pantry
- Amtico flooring
- Bottle storage in bar opposite galley
- Large doghouse storage forward of galley
MASTER STATEROOM AFT
- Queen Berth with storage
- Cedar lined hanging closet
- Nightstands with drawers
- Cabinet storage
- TV & soundbar built in to wall
- Head with separate shower
- Solid Surface countertops
- Mirorred medine cabinet
Tackle Room to stbd
- Solid surface countertops
- Lockable storage for rods/ reels
- Storage cabinets
Bunk stateroom to stbd
- Over under bunks
- Nightstands with storage for both berths
- Cedar lined hanging locker
VIP stateroom
- Queen berth
- Flip up bed with storage underneath
- Cedar lined Hanging lockers
- Storage overhead in bulkheads
- Head with separate shower
- Solid surface countertops & floors in head
- Mirrored medicine cabinet
Companion Laundry
- Haier Full size Vented Dryer (new in 2022)
- Haier Full size Washer (new in 2022)
- Wing board Rod Holders 3-Port 3- Starboard
- Circulating Livewell with LED lighting in Transom Fish Box
- Lift Up Coaming Gate
- Companion Helm Chair Port Side
- High Gloss Teak Helm Pod
- 8 Cubic Foot Top Loaded Freezer on Flybridge
- Electric Bow Thruster
- Raw Water Wash down Outlet
- Bow Stainless Anchor Shoot and Windless
- Pipewelders Hardtop with Outriggers
- Eskimo Ice chipper feeds into stbd deck fishbox
- Swim Platform
- Electric grill in Cockpit
- Fresh Water Washdown Bow Locker
- Gunnel Racks for Storage
- Teak Covering boards in Cockpit
- Lumitec Sea Blaze Underwater Lights
Gallery
















































































