Hatteras GT59 Yacht for Sale

Your search results

Yacht Description

Hatteras GT59 yacht is a 59 ft long motor yacht monohull for sale and is available to be inspected for sale in summer and winter United States. It was built by Hatterasin 2021. . The yacht layout features 3 cabins. The cabin arrangement is following: .

The motor yacht features CAT C-32A diesel 1622 hp
CAT C-32A diesel 1622 hp
engines.

Hatteras GT59 Yacht Details

3

Cabins

Hatteras

Built by

€3,599,000

Price

30

Cruising Speed

Price Details

Price from: €3,599,000

High season rate:

Amenities

    Specifications

    • CAT C-32A diesel 1622 hp
      CAT C-32A diesel 1622 hp

    Features

    Cruising Speed: 30

    More Specifications

    Other Entertainment

    • Interior cabinetry in satin finished teak 
    • Leather sofa with storage and pull out berth 
    • Teak coffee table in high gloss teak with flip up desk style top, storage 
    • Leather dinette with storage under and high gloss teak table
    • Carpet flooring with Amtico floor at entry door
    • Samsung 40" TV with electric lift in teak counter fwd of dinette
    • Denon Salon AV/receiver - Model  AVRX3600HBKE3 
    • KVH Sat TV
    • Definitive Technology subwoofer - model SUPERCUBE 2000
    • Samsung Blue ray player
    • Two Jenn-Air drawer fridges(2 drawers each) - model JUDFP242HXO1
    • Miele 4 burner electric cooktop - model KM56212
    • Sharp microwave - model R-1881LSY
    • U-Line icemaker opposite galley - model ULN-B195CB-03A
    • Emerson garbage disposal in stainless steel sink
    • Corian blue countertops 
    • Storage cabinets & full height pantry
    • Amtico flooring
    • Bottle storage in bar opposite galley
    • Large doghouse storage forward of galley 

    MASTER STATEROOM AFT

    • Queen Berth with storage
    • Cedar lined hanging closet
    • Nightstands with drawers
    • Cabinet storage 
    • TV & soundbar built in to wall
    • Head with separate shower 
    • Solid Surface countertops
    • Mirorred medine cabinet

    Tackle Room to stbd

    • Solid surface countertops
    • Lockable storage for rods/ reels
    • Storage cabinets

    Bunk stateroom to stbd

    • Over under bunks
    • Nightstands with storage for both berths
    • Cedar lined hanging locker

    VIP stateroom

    • Queen berth 
    • Flip up bed with storage underneath
    • Cedar lined Hanging lockers
    • Storage overhead in bulkheads
    • Head with separate shower
    • Solid surface countertops & floors in head
    • Mirrored medicine cabinet

    Companion Laundry

    • Haier  Full size Vented Dryer (new in 2022)
    • Haier Full size Washer (new in 2022)

     

    • Wing board  Rod Holders 3-Port 3- Starboard
    • Circulating Livewell with LED lighting in Transom Fish Box
    • Lift Up Coaming Gate
    • Companion Helm Chair Port Side
    • High Gloss Teak Helm Pod
    • 8 Cubic Foot Top Loaded Freezer on Flybridge
    • Electric Bow Thruster
    • Raw Water Wash down Outlet
    • Bow Stainless Anchor Shoot and Windless
    • Pipewelders Hardtop with Outriggers
    • Eskimo Ice chipper feeds into stbd deck fishbox
    • Swim Platform
    • Electric grill in Cockpit
    • Fresh Water Washdown Bow Locker
    • Gunnel Racks for Storage
    • Teak Covering boards in Cockpit
    • Lumitec Sea Blaze Underwater Lights
    The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.

    Gallery

    Main image of Hatteras GT59 yachtImage of Hatteras GT59 yacht #2Image of Hatteras GT59 yacht #3Image of Hatteras GT59 yacht #4Image of Hatteras GT59 yacht #5Image of Hatteras GT59 yacht #6Image of Hatteras GT59 yacht #7Image of Hatteras GT59 yacht #8Image of Hatteras GT59 yacht #9Image of Hatteras GT59 yacht #10Image of Hatteras GT59 yacht #11Image of Hatteras GT59 yacht #12Image of Hatteras GT59 yacht #13Image of Hatteras GT59 yacht #14Image of Hatteras GT59 yacht #15Image of Hatteras GT59 yacht #16Image of Hatteras GT59 yacht #17Image of Hatteras GT59 yacht #18Image of Hatteras GT59 yacht #19Image of Hatteras GT59 yacht #20Image of Hatteras GT59 yacht #21Image of Hatteras GT59 yacht #22Image of Hatteras GT59 yacht #23Image of Hatteras GT59 yacht #24Image of Hatteras GT59 yacht #25Image of Hatteras GT59 yacht #26Image of Hatteras GT59 yacht #27Image of Hatteras GT59 yacht #28Image of Hatteras GT59 yacht #29Image of Hatteras GT59 yacht #30Image of Hatteras GT59 yacht #31Image of Hatteras GT59 yacht #32Image of Hatteras GT59 yacht #33Image of Hatteras GT59 yacht #34Image of Hatteras GT59 yacht #35Image of Hatteras GT59 yacht #36Image of Hatteras GT59 yacht #37Image of Hatteras GT59 yacht #38Image of Hatteras GT59 yacht #39Image of Hatteras GT59 yacht #40Image of Hatteras GT59 yacht #41Image of Hatteras GT59 yacht #42Image of Hatteras GT59 yacht #43Image of Hatteras GT59 yacht #44Image of Hatteras GT59 yacht #45Image of Hatteras GT59 yacht #46Image of Hatteras GT59 yacht #47Image of Hatteras GT59 yacht #48Image of Hatteras GT59 yacht #49Image of Hatteras GT59 yacht #50Image of Hatteras GT59 yacht #51Image of Hatteras GT59 yacht #52Image of Hatteras GT59 yacht #53Image of Hatteras GT59 yacht #54Image of Hatteras GT59 yacht #55Image of Hatteras GT59 yacht #56Image of Hatteras GT59 yacht #57Image of Hatteras GT59 yacht #58Image of Hatteras GT59 yacht #59Image of Hatteras GT59 yacht #60Image of Hatteras GT59 yacht #61Image of Hatteras GT59 yacht #62Image of Hatteras GT59 yacht #63Image of Hatteras GT59 yacht #64Image of Hatteras GT59 yacht #65Image of Hatteras GT59 yacht #66Image of Hatteras GT59 yacht #67Image of Hatteras GT59 yacht #68Image of Hatteras GT59 yacht #69Image of Hatteras GT59 yacht #70Image of Hatteras GT59 yacht #71Image of Hatteras GT59 yacht #72Image of Hatteras GT59 yacht #73Image of Hatteras GT59 yacht #74Image of Hatteras GT59 yacht #75Image of Hatteras GT59 yacht #76Image of Hatteras GT59 yacht #77Image of Hatteras GT59 yacht #78Image of Hatteras GT59 yacht #79Image of Hatteras GT59 yacht #80Image of Hatteras GT59 yacht #81
    • Hatteras GT59

      Price: €3,599,000

    • Hidden
      MM slash DD slash YYYY
    • Hidden
      MM slash DD slash YYYY
    • Hidden
    • This field is for validation purposes and should be left unchanged.

    • Hatteras GT59

      Price: €3,599,000

    • I would like to make an offer!

    • Hidden
      MM slash DD slash YYYY
    • Hidden
      MM slash DD slash YYYY
    • Hidden
    • This field is for validation purposes and should be left unchanged.

    MAKE AN OFFER

    Make A STANDARD INQUIRY

  • Inquire
    Explore

    Boat Type

    Hulls

    Minimum Cabins

    Year
    Price